Water Treatment Sized for the Building
A canteen serving nine hundred lunches has a different water problem to a kitchen. We survey the site, design around what is actually coming out of the mains, install it, and keep it running.
How a Project Runs
Four stages, one team.No system is quoted before the water has been looked at.
- 01
Site Survey
We visit, test the incoming water and look at how much you use and when.
- 02
Design and Quote
A system specified for that building and that demand, with the costs set out before anything is ordered.
- 03
Installation
Fitted and commissioned by our own team, scheduled around your operating hours.
- 04
Service Contract
Filter changes and maintenance on a schedule, so nobody has to remember it.
Where These Systems Go
Anywhere a building goes through more water than a household does.
- 01Universities and Campuses
- 02Cafeterias and Canteens
- 03Hotels and Hospitality
- 04Factories and Production
- 05Offices and Apartment Blocks
- 06Clinics and Care Facilities
Industrial and Commercial
Start with a Survey
Tell us the building and what it is used for.We will arrange a visit and quote from what we find, not from a price list.